LMP Project

Commencement date: June 2016

Completion date: December 2017

Works performed by ECC‐VECO under the Project:

  • construction and assembly of the mud/brine/water storage tanks, bulk tanks, mixing tanks, Utilidor;
  • base construction;
  • positioning of equipment;
  • pipe installation (bolting and welding);
  • electrical connection;
  • shelter installation.