First Stage Production

Commencement date: June 2009

Completion date: December 2011

The following was performed as part of the project:

  • Installation, construction, fabrication, testing, setup, turnover and commissioning of the following key components:
    • Infrastructure and early field works (roads, bridges etc.);
    • Well site facilities;
    • First stage production facilities (process and non-process).
  • The supply, rental and maintenance of all site establishment and temporary construction facilities required for the performance of Work, including, but not limited to the following: site offices, warehouse, change rooms, waste disposal containers, canteen, utilities, showers, toilets, consumables, expendables, furniture, copiers, telephone, installation and fax machines, safety and control systems.
  • Camp construction and maintenance. Maintenance and operation of the temporary base.
  • Assembly and erection of modular substations and LERs;
  • Heating, ventilation, air conditioning system installations;
  • Installation, erection, leveling/alignment, grouting, check out, testing and maintenance of all the mechanical equipment and other similar services.